Adani Power
- Market cap
- ₹ 3,93,119 Cr.
- P/E
- 21.6x
- P/B
- 6.06x
- 52-week range
- 128.1 – 254.2
- ROE
- 21%
- ROCE
- 17%
- Dividend yield
- 0%
- Debt / equity
- 0.84
- Sector
- Power
- Industry
- Integrated Power Utilities
- Listed on
- NSE, BSE
About
Adani Power Limited is an India-based private base load power generation company. The Company has an installed thermal power capacity of approximately 18,150 megawatts (MW) spread over 13 power plants and a 40 MW solar power plant in Gujarat. Its segments include Power Generation and related activities and Trading, Investment and other activities. It sells power generated from its projects under a combination of long-term power purchase agreements (PPAs), supplemental power purchase agreements (SPPAs), medium-term PPA, short-term PPA, and on a merchant basis. Its power plants are located in various locations, including Mundra, Gujarat; Tiroda and Butibori, Maharashtra; Kawai, Rajasthan; Udupi, Karnataka; Raipur, Chhattisgarh; Raigarh, Chhattisgarh; Godda, Jharkhand; Singrauli, Madhya Pradesh (ongoing expansion); Singrauli, Madhya Pradesh, and Bitta, Gujarat. Its Udupi power plant operates as an imported coal-based utility with a capacity of approximately 1.2 gigawatts (GW).
Quick check
The five things to look at first. Open one for more.
Compared with its industry
Integrated Power Utilities: 6 companies →Adani Power against the typical company in its industry. The rank is out of the companies that report each figure; green means the better quarter of the pack, red the worse quarter.
- Valuation (P/E)21.6 against a typical 24.1: cheaper than most peers (1st = cheapest).3rd of 6
- Sales growth+44.5% against a typical +6.9% from a year earlier.1st of 6
- Profit growth+141.5% against a typical +24.7% from a year earlier.2nd of 6
- Share price, 3 months−1.4% against a typical −9.1%.1st of 6
- Size₹ 3,93,118.5 Cr. market value against a typical ₹ 40,447.2 Cr. (1st = largest).1st of 6
Latest announcements
Exchange filings and their impact on the company.
- Adani Power signs 25-year 1,234 MW supply deal with Uttarakhand discom, adding long-term contracted capacity.
AIAI analysisPositive for shareholdersHigh impact Adani Power signs 25-year 1,234 MW supply deal with Uttarakhand discom, adding long-term contracted capacity.
Adani Power has signed a 25-year Power Supply Agreement with Uttarakhand Power Corporation for 1,234 MW net supply (1,320 MW installed thermal capacity) after being declared the successful bidder. This follows its October 14, 2026 intimation about the bid win. The deal adds long-term contracted capacity that will require building new thermal capacity, so it boosts the long-term order book with no revenue in the next 12 months.
Why it matters: 25-year PSA for 1234 MW net (1320 MW installed) adds ~7-8% to capacity with ~Rs 110000-130000 cr lifetime contracted revenue and ~Rs 10560 cr build cost, material versus TTM revenue of Rs 65015 cr, but with no generation in next 12 months as plant is to be built.
For shareholders: 25-year contracted 1,234 MW PPA gives long-term revenue visibility that outweighs near-term build-out cost.
Estimated effect over the next 12 months
Estimated effect over the next 12 months Metric Now Estimated change Confidence Revenue ₹ 65,015 Cr. TTM Sep 20260% · +₹ 0 Cr. 1320 MW installed / 1234 MW net is greenfield thermal capacity needing 3-4 years to build, so no generation or billing from this PSA in next 12 months vs TTM revenue of Rs 65015 cr85% Net profit ₹ 18,645 Cr. TTM Sep 20260% · +₹ 0 Cr. No incremental generation in next 12 months so no incremental profit vs TTM net profit Rs 18645 cr; pre-operative and interest during construction capitalised85% EPS ₹ 9.45 TTM Sep 20260% · +₹ 0 No incremental profit in next 12 months so no change to TTM EPS of Rs 9.4585% Order book — no disclosed order book in context▲ +₹ 1,10,000 Cr. to +₹ 1,30,000 Cr. 1234 MW net x 8760 hrs x 85% PLF = ~9189 MU per year x assumed Rs 5.5 per unit = ~Rs 5050 cr per year x 25 years = ~Rs 126000 cr lifetime contracted revenue; range for tariff 5.0-5.760% Capex ₹ 1,14,069 Cr. Sep 2026 balance sheet fixed assets 68530 plus CWIP 45539▲ +2.6% to +3.5% · +₹ 3,000 Cr. to +₹ 4,000 Cr. New 1320 MW thermal build at ~Rs 8 cr per MW = ~Rs 10560 cr total capex, ~30-35% or Rs 3000-4000 cr to be spent in next 12 months60% Net debt ₹ 63,061 Cr. Sep 2026 borrowings▲ +3.2% to +4.8% · +₹ 2,000 Cr. to +₹ 3,000 Cr. ~70% debt funding of Rs 3000-4000 cr first-year capex for 1320 MW plant adds Rs 2000-3000 cr to debt in next 12 months60% Generated by AI from the original document. It can be wrong or incomplete and is not investment advice. Check the source before acting on it. Estimates are rough projections, not forecasts by Minerva Capital Research Solutions.
Adani Power has signed a 25-year Power Supply Agreement with Uttarakhand Power Corporation for 1,234 MW net supply (1,320 MW installed thermal capacity) after being declared the successful bidder. This follows its October 14, 2026 intimation about the bid win. The deal adds long-term contracted capacity that will require building new thermal capacity, so it boosts the long-term order book with no revenue in the next 12 months.
- 30 Oct 2026Analysts/Institutional Investor Meet/Con. Call UpdatesHigh impactVery positivePrice +3.4% on 2 NovBlockbuster Q2 with PAT doubling drives 15% revenue growth and self-funded 24GW expansion after AA+ upgrade.
AIAI analysisVery positive for shareholdersHigh impact Blockbuster Q2 with PAT doubling drives 15% revenue growth and self-funded 24GW expansion after AA+ upgrade.
Adani Power reported a blockbuster Q2 FY27 with power sales up 11.5% to 26.4 billion units, continuing revenue up 28.5% to Rs 17,528 crore and profit after tax up 141.5% to Rs 7,019 crore including Rs 2,422 crore of Gujarat prior-period revenue. Its credit rating was upgraded from AA to AA+, it won a 25-year 1,320 MW PPA from Uttarakhand at Rs 4.30 per unit, entered hydro via GVK Energy's 330 MW plant and a 770 MW Bhutan joint venture, and synchronized the first 660 MW Korba Phase-II unit for commissioning shortly. Management said peak debt will reach about Rs 1 lakh crore by FY30-31 to fund growth from 18 GW to 42 GW organic plus 3 GW inorganic capacity by 2032.
Why it matters: Q2 FY27 continuing revenue up 28.5% to 17528 cr and PAT up 141.5% to 7019 cr on 11.5% volume growth, AA to AA+ upgrade, 1320MW Uttarakhand PPA taking tied pipeline to 62% of 24GW, and Korba 660MW synchronized for Q3 commissioning drive material earnings and balance-sheet expansion over next 12 months.
For shareholders: Record volumes, pricing and PAT plus rating upgrade and 1320MW PPA outweigh fuel-cost lag and Haryana provision reversal.
Estimated effect over the next 12 months
Estimated effect over the next 12 months Metric Now Estimated change Confidence Revenue ₹ 65,015 Cr. TTM ended Sep 2026▲ +14.6% to +17.7% · +₹ 9,500 Cr. to +₹ 11,500 Cr. H1 FY27 continuing revenue 35464 cr up 27.5% plus Q2 17014 cr up 29.8% on 11.5% volume and 12.7% PPA realization plus Korba 660MW commissioning in Q3 FY27 adds ~1000 cr in next 12 months78% Operating margin 39% TTM ended Sep 2026▼ −1.5 pts to −0.5 pts Q2 continuing EBITDA margin 36.1% vs ~39% last year due to 50% rise in imported coal cost with 6-month indexation lag for Gujarat PPAs partly offset by 35-40% domestic coal at Tuticorin65% Net profit ₹ 18,645 Cr. TTM ended Sep 2026▲ +21.5% to +29.5% · +₹ 4,000 Cr. to +₹ 5,500 Cr. H1 FY27 PAT 11886 cr up 91.4% and Q2 PAT 7019 cr up 141.5% on strong volumes and 2422 cr Gujarat prior-period catch-up less 1970 cr Haryana reversal; continuing PBT up 32.5% plus lower finance cost after AA to AA+ upgrade sustains growth72% EPS ₹ 9.45 TTM ended Sep 2026▲ +21.2% to +29.6% · +₹ 2 to +₹ 2.8 No dilution indicated; EPS tracks net profit growth of 21-30% on same share base72% Net debt ₹ 54,670 Cr. FY26 ended Mar 2026▲ +14.6% to +20.1% · +₹ 8,000 Cr. to +₹ 11,000 Cr. Gross debt 61860 cr Sep 2026 vs 53556 cr Mar 2026 but net debt flat at 45846 cr vs 45022 cr as capex funded by accruals including 6000 cr GUVNL receipt; 24GW pipeline needs debt toward 100000 cr peak by FY30-31 so up 8000-11000 cr in next 12 months70% Market cap ₹ 3,50,981.44 Cr. As of 2026-10-22▲ +10% to +15% · +₹ 35,098.14 Cr. to +₹ 52,647.22 Cr. Record revenue and PAT, AA+ upgrade, 62% of 24GW tied including new 1320MW Uttarakhand PPA, Korba sync and hydro entry support re-rating60% Order book — No order book disclosed in context▲ +₹ 3,400 Cr. to +₹ 3,600 Cr. New 25-year 1320MW PPA from Uttarakhand at Rs 4.30 per unit for Korba 2; 1320MW at 70% PLF gives ~8.1 billion units per year x 4.3 = ~3480 cr annual contracted revenue starting after 4 years80% Working capital 0 days FY26▲ +5 to +10 Working Capital Days -0 in FY26; higher volumes up 11.5-14.3% and 41.8% higher fuel cost raise coal stock and receivables partly offset by 6000 cr GUVNL collection, net 5-10 days increase55% Capex ₹ 1,04,454 Cr. FY26 ended Mar 2026▲ +23.9% to +28.7% · +₹ 25,000 Cr. to +₹ 30,000 Cr. Fixed Assets 69401 cr plus CWIP 35053 cr in Mar 2026 rising to 68530 plus 45539 cr by Sep 2026; 24GW thermal pipeline across Korba Mahan Raipur Raigarh Mirzapur Anuppur plus Bhutan hydro JV and GVK hydro implies 25000-30000 cr addition in next 12 months75% Net worth ₹ 64,937 Cr. FY26 ended Mar 2026▲ +26.2% to +30.8% · +₹ 17,000 Cr. to +₹ 20,000 Cr. Equity 3857 cr plus Reserves 61080 cr; H1 PAT 11886 cr with zero dividend and full retention plus amalgamation tax benefit drives 17000-20000 cr accretion over next 12 months78% Generated by AI from the original document. It can be wrong or incomplete and is not investment advice. Check the source before acting on it. Estimates are rough projections, not forecasts by Minerva Capital Research Solutions.
Adani Power reported a blockbuster Q2 FY27 with power sales up 11.5% to 26.4 billion units, continuing revenue up 28.5% to Rs 17,528 crore and profit after tax up 141.5% to Rs 7,019 crore including Rs 2,422 crore of Gujarat prior-period revenue. Its credit rating was upgraded from AA to AA+, it won a 25-year 1,320 MW PPA from Uttarakhand at Rs 4.30 per unit, entered hydro via GVK Energy's 330 MW plant and a 770 MW Bhutan joint venture, and synchronized the first 660 MW Korba Phase-II unit for commissioning shortly. Management said peak debt will reach about Rs 1 lakh crore by FY30-31 to fund growth from 18 GW to 42 GW organic plus 3 GW inorganic capacity by 2032.
- Adani Power won a 25-year 1,234 MW UPCL supply deal needing a new 1,320 MW thermal plant.
AIAI analysisPositive for shareholdersHigh impact Adani Power won a 25-year 1,234 MW UPCL supply deal needing a new 1,320 MW thermal plant.
Adani Power received a Letter of Award from Uttarakhand Power Corporation for 1,234 MW ex-bus supply from 1,320 MW of thermal capacity under a 25-year power supply agreement. The award was after competitive bidding and is subject to Uttarakhand Electricity Regulatory Commission approval of tariff. It locks in a large long-term contracted revenue stream but will require building new capacity, so no sales contribution is expected in the next 12 months while early capex begins.
Why it matters: LoA for 1234 MW ex-bus supply for 25 years subject to UERC tariff adoption implies a new 1320 MW plant with about Rs 115000-126000 cr lifetime revenue but no dispatch in the next 12 months while triggering Rs 2500-3500 cr of early capex.
For shareholders: 25-year contracted volumes lock in large long-term cash flows that outweigh near-term capex and approval risk.
Estimated effect over the next 12 months
Estimated effect over the next 12 months Metric Now Estimated change Confidence Order book — No disclosed order book baseline in context▲ +₹ 1,14,875 Cr. to +₹ 1,26,350 Cr. 1234 MW ex-bus at 85% PLF gives about 9.19 TWh per year; at Rs 5.0-5.5 per kWh this is Rs 4595-5054 cr per year x 25 years = Rs 114875-126350 cr total contracted value70% Revenue ₹ 54,241 Cr. FY26 (Mar 2026)0% · +₹ 0 Cr. Greenfield 1320 MW thermal plant needs UERC tariff adoption plus 36-48 months construction, so no generation or PSA revenue in next 12 months on FY26 revenue of Rs 54241 cr85% Net profit ₹ 12,971 Cr. FY26 (Mar 2026)0% · +₹ 0 Cr. No revenue contribution in next 12 months during approval and early construction, so no incremental profit on FY26 net profit of Rs 12971 cr80% EPS ₹ 6.66 FY26 (Mar 2026)0% · +₹ 0 No profit accretion in next 12 months, so no change to FY26 EPS of Rs 6.6680% Operating margin 37% FY26 (Mar 2026)0% · 0 pts No operating revenue in next 12 months, so no change to FY26 operating margin of 37%80% Capex ₹ 1,04,454 Cr. FY26 balance sheet (Fixed Assets 69401 + CWIP 35053)▲ +2.4% to +3.4% · +₹ 2,500 Cr. to +₹ 3,500 Cr. New 1320 MW coal plant at Rs 8-9 cr per MW costs Rs 10560-11880 cr over 3-4 years; assume 25-30% early works and advances in next 12 months = Rs 2500-3500 cr on base of Rs 104454 cr65% Net debt ₹ 54,670 Cr. FY26 balance sheet Borrowings Mar 2026▲ +3.3% to +4.6% · +₹ 1,800 Cr. to +₹ 2,500 Cr. Early capex of Rs 2500-3500 cr funded at about 70% debt implies Rs 1800-2500 cr added debt in next 12 months on borrowings of Rs 54670 cr60% Market cap ₹ 3,64,480.73 Cr. 2026-10-08 market cap▲ +2% to +4% · +₹ 7,290 Cr. to +₹ 14,579 Cr. 25-year contracted cash flow for 7-8% capacity addition typically re-rates stock 2-4% on announcement, pending UERC approval55% Generated by AI from the original document. It can be wrong or incomplete and is not investment advice. Check the source before acting on it. Estimates are rough projections, not forecasts by Minerva Capital Research Solutions.
Adani Power received a Letter of Award from Uttarakhand Power Corporation for 1,234 MW ex-bus supply from 1,320 MW of thermal capacity under a 25-year power supply agreement. The award was after competitive bidding and is subject to Uttarakhand Electricity Regulatory Commission approval of tariff. It locks in a large long-term contracted revenue stream but will require building new capacity, so no sales contribution is expected in the next 12 months while early capex begins.
- Adani Power added a 770 MW Bhutan hydro JV with no near-term earnings but long-term clean-energy optionality.
AIAI analysisPositive for shareholdersLow impact Adani Power added a 770 MW Bhutan hydro JV with no near-term earnings but long-term clean-energy optionality.
Adani Power signed a shareholders agreement on October 5, 2026 with Bhutan's Druk Green Power to build the 770 MW Chamkharchhu-I hydropower project under a 49:51 joint venture on a 30-year BOOT concession. Construction is to start in the first half of 2027 with commissioning six years after groundbreaking, as part of a broader 5,000 MW Bhutan partnership. The project adds long-term hydro capacity and India-export potential but contributes no revenue in the next 12 months with only initial equity funding required.
Why it matters: 770 MW is ~4.2% on 18290 MW existing capacity but commissioning is ~6 years away in ~2032-33, so next-12-month impact is only ~Rs 49 cr initial equity plus early works (~Rs 100-250 cr) which is negligible versus Rs 59033 cr TTM revenue and Rs 104454 cr fixed assets+CWIP base.
For shareholders: The 49:51 Bhutan hydro JV expands long-term growth and export optionality with minimal spend in the next 12 months.
Estimated effect over the next 12 months
Estimated effect over the next 12 months Metric Now Estimated change Confidence Revenue ₹ 59,033 Cr. TTM to Jun 2026 (company context TTM sales)0% · +₹ 0 Cr. construction starts H1 2027 and commissioning targeted 6 years from groundbreaking (~2032-33), so no generation or power sales from 770 MW Chamkharchhu-I in next 12 months90% Capex ₹ 1,04,454 Cr. FY26 Mar 2026 balance sheet: Fixed Assets 69401 + CWIP 35053▲ +0.1% to +0.24% · +₹ 100 Cr. to +₹ 250 Cr. 770 MW hydro at ~Rs 10 cr per MW implies ~Rs 7700 cr project cost; 49% APL JV with ~30% equity implies ~Rs 1130 cr APL equity over 6 years; initial issue 4.9M shares at BTN 100 (~Rs 49 cr) plus early mobilization in H1 2027 -> ~Rs 100-250 cr outflow in next 12 months50% Generated by AI from the original document. It can be wrong or incomplete and is not investment advice. Check the source before acting on it. Estimates are rough projections, not forecasts by Minerva Capital Research Solutions.
Adani Power signed a shareholders agreement on October 5, 2026 with Bhutan's Druk Green Power to build the 770 MW Chamkharchhu-I hydropower project under a 49:51 joint venture on a 30-year BOOT concession. Construction is to start in the first half of 2027 with commissioning six years after groundbreaking, as part of a broader 5,000 MW Bhutan partnership. The project adds long-term hydro capacity and India-export potential but contributes no revenue in the next 12 months with only initial equity funding required.
Credit ratings
Every rating action on file, newest first, including reaffirmations. Open a row for the agency's reasoning. All credit rating updates
High safety
Rated AA+ to AA by 4 agencies- ICRA raised its rating on 10 Nov 2026. CRISIL may follow.
| Agency | Current rating | Outlook | As of |
|---|---|---|---|
| ICRA | [ICRA]AA+ | Stable | 10 Nov 2026 |
| India Ratings | IND AA+ | Stable | 31 Aug 2026 |
| CARE | CARE AA+ | Stable | 17 Aug 2026 |
| CRISIL | Crisil AA | Stable | 30 Mar 2026 |
| Rating | Details | |||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10 Nov 2026 | ▲ Upgrade1 notch | [ICRA]AA → [ICRA]AA+ | Medium | ICRA | ₹ 82,511.7 Cr. | |||||||||||||||||||||||||||||||||
Rating details
ICRA upgraded Adani Power to AA+ on strong plant performance and near-term capacity additions. ICRA upgraded Adani Power's long-term rating to AA+ with Stable outlook from AA, and reaffirmed short-term A1+, covering Rs 90500 crore of loans, working capital, bank guarantees and NCDs. The agency cited India's largest private thermal portfolio of 18.33 GW, plant availability of 93% in H1 FY2027, 94-95% long-term PPA cover, and improved leverage with debt to operating profit at 2.5 times in FY2026. It expects growth from plants commissioning soon and a Rs 2 lakh crore expansion to about 42 GW by FY2032, while watching execution, fuel tie-ups for 9 GW, and Bangladesh receivables of USD 374 million. Why it matters: ICRA upgraded long-term rating to AA+ Stable on 18.33 GW operating base with 89-93% availability, 94-95% PPA tie-up, OPBDITA Rs 19564 cr in FY2026, leverage improved to 2.5x debt/OPBDITA and 4.6x DSCR, with Korba and Mahan units commissioning imminently, tempered by Rs 2 lakh cr capex to 42 GW by FY2032 and untied-fuel and discom risks. For shareholders: Upgrade to AA+ with Stable outlook lowers future borrowing costs and validates stronger cash flows from higher PLF and PPA tie-ups. Estimated effect over the next 12 months
Generated by AI from the original document. It can be wrong or incomplete and is not investment advice. Check the source before acting on it. Estimates are rough projections, not forecasts by Minerva Capital Research Solutions. | ||||||||||||||||||||||||||||||||||||||
| 31 Aug 2026 | ▲ Upgrade1 notch | IND AA → IND AA+ | — | India Ratings | ₹ 90,500 Cr. | |||||||||||||||||||||||||||||||||
Rating details
No AI analysis yet for this rating. The agency's rationale has the full reasoning. | ||||||||||||||||||||||||||||||||||||||
| 17 Aug 2026 | ▲ Upgrade1 notch | CARE AA → CARE AA+ | — | CARE | ₹ 98,000 Cr. | |||||||||||||||||||||||||||||||||
Rating details
No AI analysis yet for this rating. The agency's rationale has the full reasoning. | ||||||||||||||||||||||||||||||||||||||
| 30 Mar 2026 | Reaffirmed | Crisil AA | — | CRISIL | ₹ 69,000 Cr. | |||||||||||||||||||||||||||||||||
Rating details
No AI analysis yet for this rating. The agency's rationale has the full reasoning. | ||||||||||||||||||||||||||||||||||||||
| 27 Feb 2026 | Reaffirmed | [ICRA]AA | — | ICRA | ₹ 69,000 Cr. | |||||||||||||||||||||||||||||||||
Rating details
No AI analysis yet for this rating. The agency's rationale has the full reasoning. | ||||||||||||||||||||||||||||||||||||||
Board meetings
Results dates and other board meetings. Full calendar
| Details | ||
|---|---|---|
| 23 Oct 2026 | Financial Results | To consider and approve the financial results for the period ended September 30, 2026 |
| 22 Jul 2026 | Financial Results | To consider and approve the financial results for the period ended June 30, 2026 |
| 29 Apr 2026 | Financial Results | To consider and approve the financial results for the period ended March 31, 2026 |
| 29 Jan 2026 | Financial Results | To consider and approve the financial results for the period ended December 31, 2025 |
| 30 Oct 2025 | Financial Results | To consider and approve the financial results for the period ended September 30, 2025 |
| 1 Aug 2025 | Financial Results | To consider and approve the financial results for the period ended Jun 30, 2025 |
Financials
Consolidated figures in ₹ crore.
| ₹ Cr. | Dec 2023 | Mar 2024 | Jun 2024 | Sep 2024 | Dec 2024 | Mar 2025 | Jun 2025 | Sep 2025 | Dec 2025 | Mar 2026 | Jun 2026 | Sep 2026 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Sales | 12,991 | 13,364 | 14,956 | 13,339 | 13,671 | 14,237 | 14,109 | 13,457 | 12,451 | 14,223 | 18,902 | 19,439 |
| Expenses | 8,346 | 8,514 | 8,761 | 8,063 | 8,648 | 9,425 | 8,424 | 8,307 | 8,213 | 9,491 | 10,953 | 11,210 |
| Operating Profit | 4,645 | 4,850 | 6,194 | 5,276 | 5,023 | 4,813 | 5,685 | 5,150 | 4,238 | 4,732 | 7,949 | 8,228 |
| OPM % | 36% | 36% | 41% | 40% | 37% | 34% | 40% | 38% | 34% | 33% | 42% | 42% |
| Other Income | 364 | 518 | 518 | 724 | 1,162 | 298 | 465 | 851 | 543 | 1,766 | 538 | 512 |
| Interest | 797 | 820 | 811 | 807 | 957 | 765 | 857 | 842 | 701 | 967 | 901 | 760 |
| Depreciation | 1,002 | 990 | 996 | 1,059 | 1,170 | 1,085 | 1,089 | 1,193 | 1,135 | 1,147 | 1,167 | 1,191 |
| Profit before tax | 3,210 | 3,558 | 4,906 | 4,134 | 4,059 | 3,261 | 4,204 | 3,966 | 2,945 | 4,384 | 6,418 | 6,789 |
| Tax % | 15% | 23% | 20% | 20% | 28% | 20% | 21% | 27% | 16% | 3% | 24% | −3% |
| Net Profit | 2,738 | 2,737 | 3,913 | 3,298 | 2,940 | 2,599 | 3,305 | 2,906 | 2,488 | 4,271 | 4,867 | 7,019 |
| EPS in Rs | 1.42 | 1.42 | 2.03 | 1.73 | 1.59 | 1.37 | 1.76 | 1.53 | 1.29 | 2.08 | 2.49 | 3.59 |
Growth and returns
Compounded yearly rates over each period.
- 10 Years
- 8%
- 5 Years
- 16%
- 3 Years
- 12%
- TTM
- 17%
- 10 Years
- 37%
- 5 Years
- 58%
- 3 Years
- 6%
- TTM
- 51%
- 10 Years
- 42%
- 5 Years
- 55%
- 3 Years
- 38%
- TTM
- —
- 10 Years
- 27%
- 5 Years
- 33%
- 3 Years
- 32%
- TTM
- —
P/E and EPS over time
Daily P/E and trailing 12-month EPS. EPS updates with each result.
Peers
Listed companies in the same business.
| Adani Power | ₹ 206.00 | ₹ 3,93,119 Cr. | 21.6x | 6.1x | 21% | — |
| Power Grid Corporation of India | ₹ 259.90 | ₹ 2,41,723 Cr. | 14.1x | 2.6x | 16.5% | 40% |
| Adani Green Energy | ₹ 1,424.10 | ₹ 2,25,582 Cr. | 129.4x | 12.5x | 10.3% | 12.1% |
| Adani Energy Solutions | ₹ 1,457.40 | ₹ 1,73,330 Cr. | 90.4x | 8.2x | 9.6% | 8.5% |
| Siemens Energy India | ₹ 2,809.00 | ₹ 1,00,299 Cr. | 108.4x | 27.4x | 30.2% | 15% |
| Tata Power Company | ₹ 352.50 | ₹ 1,12,636 Cr. | 30.4x | 3.1x | 10% | 8.2% |
Management
- Shersingh B. Khyalia
- Chief Executive Officer, Whole-Time Director
- Dilip Kumar Jha
- Chief Financial Officer
- Puneet Bansal
- Compliance Officer, Company Secretary
- Anil Kumar Sardana
- Managing Director, Executive Director
Prices are delayed and for information only. Nothing on this page is investment advice.